Roughin Checklist

The Following items need to be checked and completed at the end of each roughin to ensure compliance.
 YesNoN/A
Energex Supply Point of Attachment checked
Telstra Leadin checked against Silcar Plans
Foxtel Supply checked (Sat or Street)
TV Antenna installed and tested
Mains installed to AS3000 (Phases, size, location, Volt Drop)
Meterbox installed to AS3000 & Energex requirements
MDF & Foxtel enclosures installed to standards
Earthing installed to AS3000
 YesNoN/A
Submains installed to AS3000 (Size, Protection etc)
Switchboard installed to AS3000 ( Size, Location etc)
Dedicated Circuits installed to AS3000 (WO,HP,HWS, A/C etc)
Power Circuits installed to AS3000 (# of Points, Location etc)
Light circuits installed to AS3000
All circuits supported and adequate fixing
No equipment located in restricted zones
All points on tiles or cabinetry checked against plans
All dedicated equipment locations checked (Pumps, A/Cs, HWS)
All earthing required to AS3000 installed
 YesNoN/A
Basic Protection against damage or contact live parts
Marking - all circuits, points, switches labeled
Protection against spead of Fire
Plans marked up & Quantitys checked (Variations Completed)
Photos / Video taken of rougin
Light points marked (Crayon/Fluro Paint)
Segregation of all services to Standards req'd
Client signed off any variations / Plans
Checking Plans and Walk through with client
Marking out and Installing Brackets
Installing Mains & Meterbox
MDF & Phone / Data Cabling
Foxtel & TV Cabling
Dedicated circuits
Power Circuits
Light Circuits
Fluro Marking / Crayon & Labeling Check